GENERAL ARRANGEMENT


Industry Type:�Winery
Project Description:�Add Compressor
Disciplines Involved:�Mechanical, Civil, Traffic Study

A new compressor was needed in an area with large truck traffic that takes place at night. A traffic study was performed to reduce the chance that a truck would strike the new compressor. We designed a tall bollard system that included removable rails for maintenance. We had to track down existing water and electrical to tap into for the compressor. A concrete pad was designed to keep drainage out of the compressor and provide a good foundation for the new unit.

Key Project Responsibilities and Skills:

  • As-Build Surveying
  • Traffic Study
  • Site Plan
  • Civil
  • Mechanical, P&ID's



Industry Type:�Food Production
Project Description:�As-Build Bulk Delivery System
Disciplines Involved:�Survey, Structural

Bulk Onion Delivery System is being duplicated at another facility. The scope required Cadmaster Tech to reverse engineer the entire delivery system including the truck approach path. We developed detailed site plan, sections, details, and traffic patterns based on the existing system. Additional work was put into the new design to improve worker functionality and safety.

Key Project Responsibilities and Skills:

  • As-Build Surveying
  • 3D-Modeling
  • Detailed Structural Drawings



Industry Type:�Onion & Garlic
Project Description:�As-Build Bulk Delivery System
Disciplines Involved:�Survey, Product Conveyance

Upgrades to the bulk delivery system have been made over many years without proper documentation of the entire system. Cadmaster Tech surveyed the equipment and platform which extended from ground to a height of 60 feet. 2D Plan View drawings were sufficient for client to update necessary CAD system. The Wet Garlic line was also added to the scope to capture all equipment located in this part of the building. Future plans for expansion required good survey of all systems in the room including the drainage system.

Key Project Responsibilities and Skills:

  • Survey
  • Structural
  • 2D General Layout
  • Understanding of Conveyance System



Industry Type:�Tomato Canning
Project Description: Create Conveyance Line Mapping
Disciplines Involved: Product Conveyance, Work Flow Mapping

There are over 30 choices for the bulk delivery water chute system to deliver product to the canning lines. Simple maps were created for every option that operators face when selecting a delivery chute to a production line. Work Flow Mapping helped refine operations and management to ensure proper delivery of the product to the correct canning line.

Key Project Responsibilities and Skills:

  • Conveyance Systems
  • Work Flow Diagrams



Industry Type:�Winery
Project Description: Replace Distillation System
Disciplines Involved:�Project Management, Surveying, Mechanical, Structural, Civil, Plant Operations

Distillation system is being upgraded from the ground up while utilizing the existing 6 story structure. It was important to survey and As-Build the entire system and adjoining area. The project took place in two phases to keep operations running. This is a multi-discipline project that Cadmaster Tech was contracted to run Project Management Modeling to control the General Arrangement and produce a model capable of clash detection. The 70 foot tall tanks contained over 100 nozzles each and required close contact with the still manufacturer to ensure the stills would fit in the existing structure. The footings needed to be enlarged to bring the existing structure into compliance with existing regulations. A 7th level was added to the still structure to accommodate the larger tanks.

For the project to be a success it was important to pay close attention to operations and maintenance. The area is considered a high explosive risk area because they produced 180 proof alcohols in large volumes. Safety showers, high viz tape and extra lighting was added to the area to increase safety of the workers. Opportunities were taken to use existing steel channels to brace heavy lids for easier maintenance of the condenser tanks.

As-Build required more than just updating the existing P&ID's and Site Plans. The drawings were very old and out of date. There have been dozens of upgrades to the entire plant that react with the distillation system. A full review of the historic documents dating back to the late 1960's was required to put the full picture of underground utilities together.

Key Project Responsibilities and Skills:

  • Project Management
  • Surveying
  • Site Planning
  • Mechanical P&ID's
  • Civil
  • Underground Utilities
  • Structural
  • 3D-Modeling
  • Navisworks for Clash Detection
  • Research